How Long Does It Take to Do a Bathroom Renovation? Here’s the Real Timeline

How long does it really take to do a bathroom renovation?
Let’s break it down step by step plus, a simple tip to keep your space organized while the work is in progress.

Renovating a bathroom is one of the most rewarding home projects, it can instantly refresh your home’s look, comfort, and value.

But it’s also one of the trickiest, especially when it comes to timing. Many homeowners start with optimism (“maybe two weeks!”) only to realize that a complete bathroom renovation often takes longer than expected.

So, how long does it really take to do a bathroom renovation?
Let’s break it down step by step plus, a simple tip to keep your space organized while the work is in progress.

Average Duration of a Bathroom Renovation

The total time depends on the size of your bathroom, the complexity of the design, and your contractor’s efficiency.
Here’s a general guideline:

Type of RenovationEstimated Duration
Light renovation (minor upgrades)1–2 weeks
Medium renovation (retiling, fixture changes)3–4 weeks
Full renovation (complete redesign)5–6 weeks

These estimates assume a smooth process without material delays or unexpected issues like plumbing or electrical damage.

Main Stages of Bathroom Renovation

Each renovation follows a predictable pattern. Knowing the stages helps you plan better and set realistic expectations.

  1. Planning & Design (1–2 weeks)
    • Discuss layout and budget
    • Select materials, tiles, and fixtures
    • Finalize drawings or 3D renderings
  2. Demolition (2–4 days)
    • Remove old tiles, fixtures, mirrors, and flooring
    • Inspect plumbing and electrical lines for damage
  3. Plumbing & Electrical Work (1 week)
    • Relocate or upgrade pipes and wiring
    • Install new lighting or ventilation
  4. Tiling & Flooring (1–2 weeks)
    • Lay new tiles, grout, and waterproof coatings
    • Install flooring and skirting
  5. Fixture Installation (3–5 days)
    • Mount the sink, toilet, shower, or bathtub
    • Fit cabinets, mirrors, and accessories
  6. Painting & Finishing Touches (2–3 days)
    • Apply wall paint or sealant
    • Add final fittings and deep clean

What Affects the Renovation Timeline?

Several factors can speed up or slow down your project:

  • Bathroom size – Larger rooms naturally take more time.
  • Design complexity – Custom layouts or premium finishes require extra care.
  • Material availability – Imported tiles or fixtures can cause shipping delays.
  • Contractor expertise – Experienced teams usually work faster and more efficiently.
  • Unexpected issues – Leaky pipes, mold, or outdated wiring often extend timelines.

Pro tip: always allow at least one extra week for unplanned delays — it keeps you calm and flexible.

Tips to Make the Process Faster and Easier

  1. Finalize your design and materials before work begins.
  2. Order tiles, fixtures, and furniture early to avoid delivery delays.
  3. Clear the area completely so workers can move freely.
  4. Choose experienced, licensed professionals for quality results.
  5. Keep communication open with your contractor for smooth coordination.

Where to Keep Your Belongings During Renovation

One of the biggest challenges during renovation isn’t just dust and noise — it’s where to put everything.
From toiletries and towels to cleaning supplies and decor, bathroom items can easily clutter your home.

That’s why many homeowners use temporary storage solutions like SpaceHub self storage.

With SpaceHub, you can safely store your belongings during renovation and retrieve them anytime.
Here’s why it’s ideal:

  • 24/7 CCTV and personal PIN access
  • Air-conditioned, clean, and pest controlled units
  • Wide parking and cargo lift for easy loading
  • Flexible sizes — from Tiny to Mighty
  • Locations in Thamrin, Bendungan Hilir, Gajah Mada, and Daan Mogot

This way, your house stays neat, and your renovation runs smoothly without worrying about damaged or misplaced items.

Imagine you’re renovating a compact apartment bathroom in Thamrin.
Your contractor estimates a four week project, and you need to move out toiletries, decorations, and some small furniture.

Instead of piling them in your bedroom, you rent a Tiny unit at SpaceHub Thamrin — starting from just around IDR 300,000 per month.
The items stay safe in an air-conditioned, flood-free facility, and you can access them anytime, even at night.

When the renovation’s done, everything’s clean and ready to move back in.

So, how long does it take to do a bathroom renovation?
On average, anywhere from 2 to 6 weeks, depending on your project’s size, materials, and scope.

By planning ahead and using smart storage solutions like SpaceHub you can make the entire renovation process more efficient, organized, and stress free.

Need extra space during your home renovation?
Rent a secure, climate-controlled unit at SpaceHub Thamrin, Bendungan Hilir, Gajah Mada, or Daan Mogot, and keep your belongings safe while your new bathroom takes shape.